Illustration shows new Pattullo Bridge will have four vehicle lanes with a divider and separate lanes for pedestrians and cyclists. (Ministry of Transportation)

Contractors picked for B.C.’s Pattullo Bridge replacement

Acciona, Aecon to build union-only four-lane Fraser crossing

The B.C. government has picked a partnership of construction giants Acciona and Aecon to build the replacement for the aging Pattullo Bridge between Surrey and New Westminster.

Estimated at a cost of $1.377 billion, the new bridge and connecting roads are scheduled to be completed in 2023. Built north of the existing 83-year-old structure, the new bridge will still have only four vehicle lanes, plus pedestrian and bike lanes and a new off-ramp to Highway 17, the South Fraser Perimeter Road.

In a year-end interview with Black Press, Premier John Horgan said the Pattullo crossing is a higher priority than the congested George Massey Tunnel because the Pattullo is “falling into the river.” It is one of three projects designated by the NDP government’s “community benefits agreement” that requires construction workers to be a member of one of 19 mostly U.S.-based unions.

Transportation Minister Claire Trevena has acknowledged that the union-only deal would add about seven per cent to the cost of the project, or nearly $100 million in the case of the Pattullo.

Trevena and Horgan say the new public construction rules will result in more local hiring and use of apprentices. The Independent Contractors and Business Association cites statistics from the government’s Industry Training Authority showing three out of four apprentices are sponsored by open-shop companies, not building trades unions that run their own training facilities.

Acciona is a Spain-based multinational that is also a major contractor on the Site C dam in northern B.C. and the Walterdale Bridge in Edmonton. Its original bid was with a group including SNC Lavalin, but the Quebec-based company dropped out and the successful consortium with Aecon is called Fraser Crossing Partners.

RELATED: Pattullo Bridge seismic work scrapped as ‘cost-prohibitive’

RELATED: OUTLOOK 2020: John Horgan on forestry and union labour

RELATED: Cost jumps 35% for union-only Highway 1 widening job

Aecon Group is a long-established Ontario-based company that is building the Annacis Island wastewater treatment plant in Delta and has contracts for the Coastal GasLink pipeline across northern B.C., as well as refurbishing the John Hart Dam on Vancouver Island and the Darlingon nuclear plant in Ontario.

The Canadian government intervened in 2018 to block the sale of Aecon to China’s CCCI International Holding. Innovation Minister Navdeep Bains said at the time the decision was the result of a “multi-step national security review process.”

In a statement from its Chicago office Friday, Acciona said it and Aecon have been selected as the preferred proponent “to design, construct, and partially finance during construction” the new Pattullo Bridge.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislature

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

‘An extra $220 every 90 days’: B.C. patients pay more dispensing fees due to prescription limits

The Kelowna woman says it’s outrageous to charge for refills every 30 days

Infamous Arrowview Hotel is gone, opening up a new view in Port Alberni

Derelict hotel has had a dubious history in the past few years, from fire to demolition delays

No more ferries will sail from Departure Bay, Mill Bay, Brentwood Bay during COVID-19 pandemic

B.C. Ferries announces major changes to sailing schedules for 60 days starting Saturday, April 4

Alberni stores lend a hand to Girl Guides by selling cookies

Local store owners come forward to sell cookies when in-person sales halted over COVID-19

City of Port Alberni answers questions about COVID-19

Radio show will feature Mayor Sharie Minions and Dr. Paul Hasselback

‘Hold our line’: 29 new cases of COVID-19 announced in B.C.

Saturday’s number of new cases marks the lowest in weeks.

An ongoing updated list of Alberni Valley events affected by COVID-19

Has your event been cancelled or postponed? Check here

Critic, workers’ group ‘disappointed’ Trudeau chose Amazon to distribute PPE

Amazon Canada said in an email to The Canadian Press that it is working with Canada Post, Purolator

Full World COVID-19 update: National Guard collect ventilators in New York; Spain, Italy improve

Comprehensive coronavirus update with news from around the world.

Saanich mayor receives his foster bees through pollinator rental program

‘I feel like I’m an adoptive father,’ Fred Haynes says of his rented mason bee colony

Nanaimo’s Harmac mill works to fill doubled pulp order for medical masks and gowns

Mill’s president says extra cleaning in place and workers are social distancing

Two people fined after B.C. police spot online ads re-selling 5,000 surgical, N95 masks

Police confiscated the masks, being sold at inflated prices, and now working with Fraser Health

Sex workers face new risks during COVID-19 pandemic

‘Desperation has kicked in’ for vulnerable, undocumented workers unable to access help

Most Read