Undersea cable pitched for clean energy

A company known mostly for wind projects is reviving a proposal to connect the Vancouver Island and Washington electricity grids

Wind farm development in northeastern B.C. Proponents of a new power line between Vancouver Island and Washington say it would make wind power a more stable source.

VICTORIA – With BC Hydro struggling to control electricity rate increases and cutting back on private power acquisition, a company known mostly for wind projects is reviving a proposal to connect the Vancouver Island and Washington electricity grids.

Sea Breeze Power Corp. wants to build a 50 km transmission cable under the Strait of Juan de Fuca to connect substations near Port Angeles and Victoria. To finance the project, it’s looking for a 10-year deal to assemble surplus U.S. power and sell it to BC Hydro at a flat rate of $69 per megawatt hour.

Sea Breeze CEO Paul Manson said the power purchase would finance the construction of the cable and deliver a steady source of electricity to B.C. at lower cost than new sources built in the province. It would also improve power quality and reliability for Vancouver Island residents, he said.

First proposed in 2006, the project has received environmental permits from both sides of the border. It was rejected by the B.C. Utilities Commission, which approved upgrading the existing power line from the B.C. mainland to Vancouver Island instead.

Sea Breeze developed a wind project at Cape Scott on northern Vancouver Island, and has plans and permits for other wind sites on the B.C. coast and the Peace River region. Manson said the Juan de Fuca cable would stabilize wind power supply on the B.C. coast, where wind speeds peak in winter, with inland Washington sites where it’s windiest in summer.

Manson said U.S. policy led to major wind development that leaves the the Pacific Northwest with an excess of power in spring, meaning the Washington power utility has paid BC Hydro to take its excess when hydro dams are full.

The cable would also give B.C. more capacity to buy cheap overnight coal and nuclear power from the U.S., which BC Hydro already does with its main connecting line along Interstate 5, he said.

Energy Minister Bill Bennett said the Juan de Fuca cable is one of many proposals that came forward as BC Hydro developed its integrated resource plan. That plan estimates that with conservation and efficiency improvements in B.C., the province will need more electricity supplies within eight years.

The company has not yet demonstrated that it can assemble the firm electricity it proposes to sell, and the project has “a pretty steep slope to climb,” Bennett said.

 

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Wounded Warriors runners arrive in Port Alberni

Fundraising dinner will take place at Royal Canadian Legion

Arrowvale Farm near Port Alberni hosts maple syrup fest

Taste west coast maple syrup on Leap Year Saturday and watch demonstrations too

ACRD urges B.C. gov’t to upgrade Bamfield Road in wake of winter storm

ACRD board to write letter to Premier John Horgan, expressing urgency

More businesses in Port Alberni need a voice at city council, says one Uptown owner

Business owner says all businesses in the Alberni Valley need a louder voice

Port Alberni finishes strong in men’s bonspiel

Home teams make it to the finals at Alberni Valley Curling Club’s Men’s Open Bonspiel

Clothing, jewelry, purses: RCMP ask court about disposal of evidence in Robert Pickton case

Pickton was sentenced to life with no chance of parole for 25 years for the murders of six women

Speaker ‘will not tolerate illegal activity’ on B.C. legislature grounds, says chief of staff

Chief of staff to the B.C. speaker Alan Mullen says situation with demonstrators appears ‘fluid’

MPs to examine privacy implications of facial-recognition technology used by RCMP

The MPs will look at how the technology affects the privacy, security and safety of children

Dates back to 2009: Calgary police lay charges in fraud involving semi-trucks

Three people from Calgary are facing charges that include fraud over $5,000

Comox 442 Squadron carries out two sea rescue missions north of Vancouver Island

Submitted by Lt. Alexandra Hejduk Special to Black Press 442 Transport and… Continue reading

Wet’suwet’en hereditary chiefs optimistic ahead of talks with feds, province

Discussions with provincial and federal governments expected to start later today

‘The project is proceeding’: Horgan resolute in support of northern B.C. pipeline

B.C. premier speaks as talks scheduled with Wet’suwet’en hereditary chiefs

BREAKING: Kelowna RCMP to further investigate 12 sexual assault cases, create sexual assault unit

Recommendations come five months after it was revealed 40% of sexual assaults were deemed ‘unfounded’

Most Read