Keep your old power meter, for a fee

People who insist on refusing smart meters can keep their old mechanical meter as long as it lasts, cost to be determined

A smart meter installer photographs a sign posted to refuse replacement of mechanical power meter

VICTORIA – People who insist on refusing new wireless electrical meters can keep their old mechanical meter as long as it lasts, if they pay a monthly fee, Energy Minister Bill Bennett announced Thursday.

Customers can keep their mechanical meters until they break down, their Measurement Canada accuracy seal expires or the customer relocates, the ministry said in a statement.

The mechanical meter option is added to an earlier compromise with BC Hydro customers who still don’t have a digital smart meter, which transmits power consumption and status via radio signals. Customers can have a digital meter with its transmission function turned off, or keep their old meter, as long as they pay the cost of having the meter read manually.

Bennett said the cost of meter reading will be about $20 a month. Customers who accept a deactivated smart meter will also pay a fee of about $100 to have it adjusted.

The fee to keep a mechanical meter will be higher, because it will require a separate system to manually record and bill for power consumption, Bennett said.

NDP energy critic John Horgan said he is pleased that the proposed fees will be reviewed by the B.C. Utilities Commission before being implemented. The opt-out provision should have been made available from the start, instead of rushing to meet the government’s artificial deadline to install smart meters, Horgan said.

BC Hydro reports that 60,000 smart meter installations have been delayed due to customer requests, while 1.8 million or 96 per cent of customers now have a functioning smart meter.

Some people persist in the belief that the radio signals from smart meters are a health hazard, despite the fact that the periodic meter signals represent a tiny fraction of the radio frequency exposure from a mobile phone call.

Bennett said mechanical or “analog” meters are obsolete, and eventually every customer will have a smart meter, whether it is set to transmit or not.

“Bear in mind, when somebody’s analog meter wears out, stops working or comes to the end of its useful life, there are no analog meters to reinstall,” Bennett said. “You can’t buy them anywhere.”

 

Just Posted

Alberni Golf Club hosts Grey Cup Scramble

Very few rules in this event on Sunday, Nov. 25

City doubles bylaw fines for unsightly properties

Property maintenance makes up 80% of bylaw calls: Scott

School District 70 trustees pursue bus seat belt issue

We need to make some noise,’ chair Craig tells board

Conservation officers hunt for bear in Port Alberni

Family says a bear attacked a man in his yard near local movie theatre

Vancouver Islanders among B.C.’s most engaged on electoral reform

Parksville-Qualicum and Courtenay-Comox lead the province in voter turnout, Island high in general

Feds give formal notice for law to end Canada Post strike

Trudeau government ready to legislate employees back to work after five weeks of rotating strikes

Getzlaf lifts Ducks to 4-3 win over skidding Canucks

Vancouver now winless since Nov. 8

Pressure builds for B.C. to recognize physicians assistants

“We can make a difference and I think we’re being overlooked.”

Paramedic treated accused killer at the scene of Chemainus murder

Described strange behaviour of man with minor injuries

Senators urge Trump to expedite congressional vote on USMCA

The 12 Republican senators are warning of the dangers of getting the trade pact approved in 2019

Bill just one tool to deter foreign interference in Canadian elections: Gould

Bill C-76 is just one means to deter outside interference in Canadian elections

Investigation into B.C. legislature officers began in January

RCMP brought in months after former prison administrator started

Adair a newcomer to Chemainus at 104 years old

Not many people her age relocate, but she also just had a knee replacement a year ago

Legal challenge filed over high-stakes competition to design $60B warships

The federal government had originally said it wanted a “mature design” for its new warship fleet, which was widely interpreted as meaning a vessel that has already been built and used by another navy.

Most Read